Plan has been deliberately designed to be flexible , permitting phased, coordinated, but independent implementation of most of its elements. Accordingly, the schedule propo~es acquisition by 1990, but the schedule is not critical to the success of the Plan. G. TRIER DITCH CUT-OFF Some form. of the Trier. Ditch Cut-Off has been considered a viable flood control measure for this area since 1913. The Cut-Off proposed here is a diversion channel designed to carry approximately 40 percent of the St. Marys River flood flow around Fort Wayne. Because the Trier Ditch Cut-Off is such a major proj ect in the Plan in terms of cost and time, the task of constructing the channel is further broken into subtasks. . These subtasks include.design, right-of-way acquisition; bridge construction, St. Joseph River channel improvements, constructing the diversion structure, and the Maumee River channel improvements. The design subtasks should begin in 1983 and be completed in 1985~ Right-ofway acquisition should commence in mid-1983 and be completed by 1986. Highway, railroad, and bridge construction should begin in 1985 with a completion date to coincide with that of the balance of the Trier Ditch construction. The St. Joseph River channel improvements, diversion structure, and :t'laumee River improvements should. commence in 1987 . These dates could be staggered if found advantageous. However, it is probable that the funding will come from a single source and thereby allow all phases of work to begin concurrently. The Trier Ditch Cut-Off should be completed by 1990. 10
Object Description
Title | Fort Wayne-Allen County flood protection plan: abstract |
Topic | Floodplain, Floods |
Subject |
Flood control--Indiana--Fort Wayne Flood control--Indiana--Allen County Flood damage prevention--Indiana--Fort Wayne Flood damage prevention--Indiana--Allen County |
Geographical Coverage |
Fort Wayne, Indiana Allen County, Indiana |
Date of Original | May 1982 |
Time Period | 1900-1999 |
Source | Print version: Fort Wayne-Allen County flood protection plan: abstract. (Fort Wayne, Ind.: s.n., 1982), 18 p. |
Additional Availability | Print version might be available at IPFW Helmke Library. See online catalog. |
Rights | Copyright Indiana University-Purdue University Fort Wayne, 2006- . All rights reserved. May not be reproduced without permission. For information regarding reproduction and use see: http://cdm16776.contentdm.oclc.org/cdm/about/collection/p16776coll1/ |
Date Digitally Created | April 17 2012 |
Digital Publisher | Walter E. Helmke Library, Indiana University-Purdue University Fort Wayne |
Digitization Specifications | This pdf file was derived from 400 dpi, 1-bit, uncompressed TIFF images that were scanned from the originals using a Fujitsu 5750C scanner with Adobe Acrobat 9.0 Professional scanning software, black and white configuration. |
Content Type | Text |
Digital Format | text/pdf |
Collection | Fort Wayne Area Government Information |
Identifier | 30000121976348 |
File Name | 30000121976348.pdf |
Description
Title | Page 17 |
Transcript | Plan has been deliberately designed to be flexible , permitting phased, coordinated, but independent implementation of most of its elements. Accordingly, the schedule propo~es acquisition by 1990, but the schedule is not critical to the success of the Plan. G. TRIER DITCH CUT-OFF Some form. of the Trier. Ditch Cut-Off has been considered a viable flood control measure for this area since 1913. The Cut-Off proposed here is a diversion channel designed to carry approximately 40 percent of the St. Marys River flood flow around Fort Wayne. Because the Trier Ditch Cut-Off is such a major proj ect in the Plan in terms of cost and time, the task of constructing the channel is further broken into subtasks. . These subtasks include.design, right-of-way acquisition; bridge construction, St. Joseph River channel improvements, constructing the diversion structure, and the Maumee River channel improvements. The design subtasks should begin in 1983 and be completed in 1985~ Right-ofway acquisition should commence in mid-1983 and be completed by 1986. Highway, railroad, and bridge construction should begin in 1985 with a completion date to coincide with that of the balance of the Trier Ditch construction. The St. Joseph River channel improvements, diversion structure, and :t'laumee River improvements should. commence in 1987 . These dates could be staggered if found advantageous. However, it is probable that the funding will come from a single source and thereby allow all phases of work to begin concurrently. The Trier Ditch Cut-Off should be completed by 1990. 10 |