Page 110 |
Previous | 110 of 163 | Next |
|
small (250x250 max)
medium (500x500 max)
Large
Extra Large
large ( > 500x500)
Full Resolution
All (PDF)
|
This page
All
|
- ~STI~ 'PR~ B~:aY ~ITE~ FOR 'A TECHNICAL TRANSIT STUDY FOR THE THREE RIVERS COORDINATING COUNCIL, FORT WAYNE, INDIANA WORK I T E M 1. Study Organization 2. 5-Year Transit Improvement program 2.1 Inventory of Study Area Characteristics 2.2 Inventory of, Existing Public Transpor,.tation Services 2.3 Transit Demand Surveys and Analysis 2.4 Develop Recommended'S-Year Program 3. Consolidation of Transportation Functions 3.1 Legal Considerations 3.2 Functional Considerations 3.3 Similar Consolidation Efforts 3.4 Recommendations 4. Future, (2000), Transit Demands and Concepts 4.1 4.2 4.3 4.4 4.5 Refine Long Range 'Goals Identify Alternative Long Range Transit Concepts Establish Evaluation criteria Identify Future Travel Demands Develop 2,000 Recommended concepts 5. Report Preparation 5.1, Preparation of Draft Report 5.2 Preparation of Final Report 5.3 Bookkeeping Services Subtotal 6. Miscellaneous Cost Items 6.1 ,Travel, Subsistence, and Car Rental 6.2 Overhead, Supplies, Telephone, Etc. 6.3 Reproduction Costs Subtotal TOTAL (1) to'be funded by.UMTA CONSULTANTS COST $ 825 5,500 14,960 27,500 275 550 550 1,650 550 3,300 1,100 3,300 3,300 7,150 2,200 $72,710 6,645 875 1,030 $8,550 $81,260 OTHER (1) LOCAL PROJECT COST NEEDS $5,000 $1,500 500 $7,000 700 1,500 2,000 $4,2,00 $11, 200 LOCAL IN-KIND ,SERVICES $ 300 2,000 450 16,866 1,000 1,800 500 100 100 $23,116 $23,116 TOTAL COST $ 1,125 2,000 5,950 36,826 27,500 1,775 550 550 1,650 1,550 3,300 1,'100 5,100 3,800 7,250 2,300 500 $102,826 7,345 2,375 3,030 $12,750 -$115,576
Object Description
Title | Application to the Urban Mass Transportation Administration, U.S. Department of Transportation for an urban mass transportation technical study grant |
Contributor |
Three Rivers Coordinating Council (Allen County, Ind.) United States. Urban Mass Transportation Administration. |
Topic | Transportation, Highways |
Subject |
Transportation--Indiana--Fort Wayne Transportation--Indiana--Allen County |
Geographical Coverage |
Fort Wayne, Indiana Allen County, Indiana |
Date of Original | 1973 |
Time Period | 1900-1999 |
Source | Print version: Application to the Urban Mass Transportation Administration, U.S. Department of Transportation for an urban mass transportation technical study grant. (Fort Wayne, Ind.: The Three Rivers Coordinating Council, 1973), 1 v. |
Additional Availability | Print version might be available at IPFW Helmke Library. See online catalog. |
Rights | Copyright Indiana University-Purdue University Fort Wayne, 2006- . All rights reserved. May not be reproduced without permission. For information regarding reproduction and use see: http://cdm16776.contentdm.oclc.org/cdm/about/collection/p16776coll1/ |
Date Digitally Created | April 17 2012 |
Digital Publisher | Walter E. Helmke Library, Indiana University-Purdue University Fort Wayne |
Digitization Specifications | This pdf file was derived from 400 dpi, 1-bit, uncompressed TIFF images that were scanned from the originals using a Fujitsu 5750C scanner with Adobe Acrobat 9.0 Professional scanning software, black and white configuration. |
Content Type | Text |
Digital Format | text/pdf |
Collection | Fort Wayne Area Government Information |
Identifier | 30000101348070 |
File Name | 30000101348070.pdf |
Description
Title | Page 110 |
Transcript | - ~STI~ 'PR~ B~:aY ~ITE~ FOR 'A TECHNICAL TRANSIT STUDY FOR THE THREE RIVERS COORDINATING COUNCIL, FORT WAYNE, INDIANA WORK I T E M 1. Study Organization 2. 5-Year Transit Improvement program 2.1 Inventory of Study Area Characteristics 2.2 Inventory of, Existing Public Transpor,.tation Services 2.3 Transit Demand Surveys and Analysis 2.4 Develop Recommended'S-Year Program 3. Consolidation of Transportation Functions 3.1 Legal Considerations 3.2 Functional Considerations 3.3 Similar Consolidation Efforts 3.4 Recommendations 4. Future, (2000), Transit Demands and Concepts 4.1 4.2 4.3 4.4 4.5 Refine Long Range 'Goals Identify Alternative Long Range Transit Concepts Establish Evaluation criteria Identify Future Travel Demands Develop 2,000 Recommended concepts 5. Report Preparation 5.1, Preparation of Draft Report 5.2 Preparation of Final Report 5.3 Bookkeeping Services Subtotal 6. Miscellaneous Cost Items 6.1 ,Travel, Subsistence, and Car Rental 6.2 Overhead, Supplies, Telephone, Etc. 6.3 Reproduction Costs Subtotal TOTAL (1) to'be funded by.UMTA CONSULTANTS COST $ 825 5,500 14,960 27,500 275 550 550 1,650 550 3,300 1,100 3,300 3,300 7,150 2,200 $72,710 6,645 875 1,030 $8,550 $81,260 OTHER (1) LOCAL PROJECT COST NEEDS $5,000 $1,500 500 $7,000 700 1,500 2,000 $4,2,00 $11, 200 LOCAL IN-KIND ,SERVICES $ 300 2,000 450 16,866 1,000 1,800 500 100 100 $23,116 $23,116 TOTAL COST $ 1,125 2,000 5,950 36,826 27,500 1,775 550 550 1,650 1,550 3,300 1,'100 5,100 3,800 7,250 2,300 500 $102,826 7,345 2,375 3,030 $12,750 -$115,576 |